98 | Space elevator¶
Bottleneck¶
Material strength, dynamics, debris, construction
Backchain¶
- Foundations I: W1 mechanics/optimization
- Foundations II: W2 structures/materials/manufacturing
- Specialization: Space industry and off-world systems
First proof of work¶
Taper/stress/material requirement model
Connected study¶
Editorial study connections grounded in the existing technology bottlenecks and subject descriptions. Background is useful preparation, not a validated prerequisite or a complete technology curriculum.
Specific subject connections have not been mapped yet.