65 | In-space manufacturing¶
Bottleneck¶
Process value, quality, economics
Backchain¶
- Foundations I: W1 optimization/metrology
- Foundations II: W2 materials/manufacturing/thermal
- Specialization: Space industry and off-world systems
First proof of work¶
Orbital process cell with yield/thermal/logistics model
Connected study¶
Editorial study connections grounded in the existing technology bottlenecks and subject descriptions. Background is useful preparation, not a validated prerequisite or a complete technology curriculum.
Specific subject connections have not been mapped yet.