6 | Planetary smart grid + expanded transmission¶
Bottleneck¶
Transmission buildout, reliability, market coordination
Backchain¶
- Foundations I: W1 optimization, control, probability
- Foundations II: W2 power electronics, reliability, manufacturing/economics
- Specialization: Energy, nuclear and fusion
First proof of work¶
Stochastic dispatch/transmission/storage optimization with contingencies
Connected study¶
Editorial study connections grounded in the existing technology bottlenecks and subject descriptions. Background is useful preparation, not a validated prerequisite or a complete technology curriculum.
Specific subject connections have not been mapped yet.